434.24 MW storage in Kings, CA · In queue since April 2023 · Proposed COD October 2030
434.24 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2030
Total Duration
7y 6m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-10-01
Clay Flats Solar is a proposed 434.24 MW battery storage project located in Kings County, California. The project is being developed within the CAISO region and has appeared in recent news coverage regarding deals. It is listed in the CAISO interconnection queue as entry CAISO-54899, with a queue entry date of April 17, 2023. The proposed commercial operation date is October 1, 2030. As of the latest data, the interconnection agreement status is "Not Started."
The project, under the utility LSPC, consists entirely of battery storage, with a total capacity of 434.24 MW. The point of interconnection is the MANNING 500 kV substation.
Generated from interconnection queue and public data sources
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
LSPC
Entity
CAISO
Service Type
—
Point of Interconnection
MANNING 500 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.