East Wonder Solar (CAISO-54960) — Project Summary

Queue ID
CAISO-54960
Capacity
555.984375 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
Not Started

East Wonder Solar

CAISO-54960BetaActiveSolarBatteryCAISOLBNL

555.984 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD July 2029

555.984 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 3m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-31

Technology
Solar367.219 MW · 66%
Battery188.766 MW · 34%
About

East Wonder Solar is a proposed hybrid Solar+Battery project located in Kern County, California, with a total capacity of 555.98 MW. The development project consists of a 367.22 MW solar component and a 188.77 MW battery energy storage system. It is listed in the CAISO interconnection queue as project CAISO-54960, with an entry date of April 17, 2023, and a proposed commercial operation date of July 31, 2029. Interconnection service will be provided by PGAE at the GATES-MIDWAY 500kV point of interconnection.

The project's interconnection agreement (IA) status is listed as "Not Started." East Wonder Solar has been the subject of recent news coverage, with two articles categorized as pertaining to industry and development.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

GATES-MIDWAY 500kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.