Wonder Solar (CAISO-54994) — Project Summary

Queue ID
CAISO-54994
Capacity
1349.359 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
Not Started

Wonder Solar

CAISO-54994BetaActiveSolarBatteryCAISOLBNL

1,349.359 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD July 2029

1,349.359 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 3m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-31

Technology
Solar890.879 MW · 66%
Battery458.48 MW · 34%
About

Wonder Solar is a proposed hybrid solar and battery project located in Kern County, California. The development project, with a total capacity of 1349.36 MW, consists of an 890.88 MW solar component and a 458.48 MW battery energy storage system. The project is in the CAISO interconnection queue (CAISO-54994), having entered the queue on April 17, 2023, with a proposed commercial operation date of July 31, 2029. Interconnection service will be provided by PGAE at the LOS BANOS-MIDWAY #2 point of interconnection.

The project's interconnection agreement status is "Not Started". Wonder Solar has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LOS BANOS-MIDWAY #2

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.