Shuteye Peak Energy Storage
105.75 MW storage in San Joaquin, CA · In queue since April 2023 · Proposed COD December 2028
105.75 MW
Capacity
1
Components
Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
The Shuteye Peak Energy Storage project is a proposed 105.75 MW battery energy storage system located in San Joaquin County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-55009, with a queue entry date of April 17, 2023. The proposed commercial operation date is December 31, 2028.
The project, which will interconnect with Pacific Gas and Electric (PGAE) at the FRENCH CAMP 60 kV point of interconnection, has not yet started the interconnection agreement (IA) process. The developer is unknown. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
San Joaquin
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
FRENCH CAMP 60 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Shuteye Peak Energy Storage