Shuteye Peak Energy Storage (CAISO-55009) — Project Summary

Queue ID
CAISO-55009
Capacity
105.75 MW
Technology
Battery
Status
active
Location
San Joaquin, CA
Region
CAISO
Developer
IA Status
Not Started

Shuteye Peak Energy Storage

CAISO-55009BetaActiveBatteryCAISOLBNL

105.75 MW storage in San Joaquin, CA · In queue since April 2023 · Proposed COD December 2028

105.75 MW

Capacity

1

Components

Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 8m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

About

The Shuteye Peak Energy Storage project is a proposed 105.75 MW battery energy storage system located in San Joaquin County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-55009, with a queue entry date of April 17, 2023. The proposed commercial operation date is December 31, 2028.

The project, which will interconnect with Pacific Gas and Electric (PGAE) at the FRENCH CAMP 60 kV point of interconnection, has not yet started the interconnection agreement (IA) process. The developer is unknown. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

San Joaquin

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

FRENCH CAMP 60 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.