Midas Energy Storage (CAISO-55014) — Project Summary

Queue ID
CAISO-55014
Capacity
518.1 MW
Technology
Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
IA Status
Not Started

Midas Energy Storage

CAISO-55014BetaActiveOther StorageCAISOLBNL

518.1 MW storage in Clark, NV · In queue since April 2023 · Proposed COD December 2028

518.1 MW

Capacity

1

Components

Other Storage

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 8m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-30

About

The Midas Energy Storage project is a proposed 518.1 MW battery storage development in Clark County, Nevada. The project is located within the California Independent System Operator (CAISO) region and is interconnected with Southern California Edison (SCE) at the Eldorado 230 kV point of interconnection.

The project, identified as CAISO-55014 in the CAISO interconnection queue, entered the queue on April 17, 2023, with a proposed commercial operation date of December 30, 2028. As of the latest data, the interconnection agreement (IA) has not yet been started. The developer is not specified in the available data.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

ELDORADO 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MCCULLGH_5_N101
POI Substation
Eldorado Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.