Musketeers Solar 1
1,046.24 MW hybrid in Tulare, CA · In queue since April 2023 · Proposed COD July 2029
1,046.24 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2029
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-31
Musketeers Solar 1 is a proposed solar and battery hybrid project located in Tulare County, California, with a total capacity of 1046.24 MW. The project, which has appeared in recent news coverage, is being developed within the CAISO region and consists of 524.39 MW of solar generation and 521.85 MW of battery energy storage. It is interconnected with Southern California Edison (SCE) at the Magunden-Springville TL #1 point of interconnection.
The project is listed in the CAISO interconnection queue as entry CAISO-55025, with a queue entry date of April 17, 2023, and a proposed commercial operation date of July 31, 2029. As of the latest data, the interconnection agreement (IA) status is "Not Started".
Generated from interconnection queue and public data sources
State
CA
County
Tulare
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
Magunden-Springville TL #1
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.