Musketeers Solar 1 (CAISO-55025) — Project Summary

Queue ID
CAISO-55025
Capacity
1046.240198 MW
Technology
Solar+Battery
Status
active
Location
Tulare, CA
Region
CAISO
Developer
IA Status
Not Started

Musketeers Solar 1

CAISO-55025BetaActiveSolarBatteryCAISOLBNL

1,046.24 MW hybrid in Tulare, CA · In queue since April 2023 · Proposed COD July 2029

1,046.24 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2029

Interconnection

Total Duration

6y 3m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-31

Technology
Solar524.39 MW · 50%
Battery521.85 MW · 50%
About

Musketeers Solar 1 is a proposed solar and battery hybrid project located in Tulare County, California, with a total capacity of 1046.24 MW. The project, which has appeared in recent news coverage, is being developed within the CAISO region and consists of 524.39 MW of solar generation and 521.85 MW of battery energy storage. It is interconnected with Southern California Edison (SCE) at the Magunden-Springville TL #1 point of interconnection.

The project is listed in the CAISO interconnection queue as entry CAISO-55025, with a queue entry date of April 17, 2023, and a proposed commercial operation date of July 31, 2029. As of the latest data, the interconnection agreement (IA) status is "Not Started".

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Tulare

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Magunden-Springville TL #1

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.