Glossy Garlic Solar (CAISO-55035) — Project Summary

Queue ID
CAISO-55035
Capacity
100 MW
Technology
Solar+Battery
Status
active
Location
Santa Clara, CA
Region
CAISO
Developer
IA Status
Not Started

Glossy Garlic Solar

CAISO-55035BetaActiveSolarBatteryCAISOLBNL

100 MW hybrid in Santa Clara, CA · In queue since April 2023 · Proposed COD March 2027

100 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2027

Interconnection

Total Duration

3y 11m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-03-01

Technology
Solar50 MW · 50%
Battery50 MW · 50%
About

The proposed Glossy Garlic Solar project is a 100 MW hybrid solar and battery energy storage development in Santa Clara County, California. The project consists of 50 MW of solar photovoltaic generation paired with 50 MW of battery storage. It is located within the California Independent System Operator (CAISO) region and is interconnected to the PGAE utility grid at the LLAGAS 115 kV point of interconnection.

The Glossy Garlic Solar project, identified as CAISO-55035 in the interconnection queue, entered the CAISO queue on April 17, 2023. The developer has proposed a commercial operation date of March 1, 2027. As of the current data, the interconnection agreement (IA) has not yet been started. The project is currently listed as active within the CAISO queue.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Santa Clara

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

LLAGAS 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.