Soledad Solar
562.502 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD June 2028
562.502 MW
Capacity
2
Components
Solar + Battery
3y 1m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-06-01
Soledad Solar is a proposed hybrid Solar+Battery project with a total capacity of 562.5 MW located in Kern County, California. The development project consists of a 560.19 MW solar component and a 2.31 MW battery energy storage system. The project, assigned queue ID CAISO-55049, is in the CAISO interconnection queue with an entry date of April 17, 2023. The proposed commercial operation date is June 1, 2028, and the interconnection agreement status is "Not Started."
The proposed project is interconnected to Southern California Edison (SCE) at the WINDHUB 230 kV point of interconnection.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
WINDHUB 230 kV
Data Source
LBNL
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ALTA6B2_7_N003
- POI Substation
- Windhub Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.