Soledad Solar (CAISO-55049) — Project Summary

Queue ID
CAISO-55049
Capacity
562.502 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
Not Started

Soledad Solar

CAISO-55049BetaActiveSolarBatteryCAISOLBNL

562.502 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD June 2028

562.502 MW

Capacity

2

Components

Solar + Battery

3y 1m

In Queue

Not Started

IA Status

COD target: 2028

Interconnection

Total Duration

5y 2m

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-01

Technology
Solar560.192 MW · 100%
Battery2.31 MW · 0%
About

Soledad Solar is a proposed hybrid Solar+Battery project with a total capacity of 562.5 MW located in Kern County, California. The development project consists of a 560.19 MW solar component and a 2.31 MW battery energy storage system. The project, assigned queue ID CAISO-55049, is in the CAISO interconnection queue with an entry date of April 17, 2023. The proposed commercial operation date is June 1, 2028, and the interconnection agreement status is "Not Started."

The proposed project is interconnected to Southern California Edison (SCE) at the WINDHUB 230 kV point of interconnection.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

WINDHUB 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ALTA6B2_7_N003
POI Substation
Windhub Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.