PUMPJACK SOLAR I (AKA PIONEER SOLAR I) (CAISO-653B) — Project Summary

Queue ID
CAISO-653B
Capacity
40 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
IA Executed

PUMPJACK SOLAR I (AKA PIONEER SOLAR I)

CAISO-653BBetaActiveSolarBatteryCAISOLBNL + Live

40 MW hybrid in Kern, CA · In queue since January 1970 · Proposed COD June 2027

40 MW

Capacity

2

Components

Solar + Battery

56y 4m

In Queue

IA Executed

IA Status

Signed Jan 1970

Interconnection

Queue → IA

<1 month

IA → COD

57y 5m

Total Duration

<1 month

Construction75%
Queue EntryJan 1, 1970

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJan 1, 1970

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-06-01

Technology
Solar20 MW · 50%
Battery20 MW · 50%
About

PUMPJACK SOLAR I (AKA PIONEER SOLAR I) is a proposed 40 MW hybrid solar and battery project located in Kern County, California. The development project consists of 20 MW of solar generation paired with 20 MW of battery storage. The project is listed in the CAISO interconnection queue as queue ID CAISO-653B.

The project entered the CAISO queue on January 1, 1970, with a proposed commercial operation date of June 1, 2027. The interconnection agreement (IA) has been executed as of January 1, 1970. The point of interconnection is the Belridge - Temblor 115 kV line.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Belridge - Temblor 115 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about PUMPJACK SOLAR I (AKA PIONEER SOLAR I)