LASSEN LODGE HYDROELECTRIC (CAISO-720) — Project Summary

Queue ID
CAISO-720
Capacity
4.5 MW
Technology
Hydro
Status
active
Location
Tehama, CA
Region
CAISO
Developer
IA Status
IA Executed

LASSEN LODGE HYDROELECTRIC

CAISO-720BetaActiveHydroCAISOLBNL + Live

4.5 MW generation in Tehama, CA · In queue since March 2011 · Proposed COD October 2027

4.5 MW

Capacity

1

Components

Hydro

15y 2m

In Queue

IA Executed

IA Status

Signed May 2013

Interconnection

Queue → IA

2y 2m

IA → COD

14y 5m

Total Duration

2y 2m

Construction75%
Queue EntryMar 31, 2011

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementMay 21, 2013

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–36 months

Commercial Operation

Proposed COD: 2027-10-15

About

The Lassen Lodge Hydroelectric project is a proposed 4.5 MW hydroelectric generation project located in Tehama County, California. The project is listed in the CAISO interconnection queue as queue ID CAISO-720. The interconnection request was filed on March 31, 2011, with a proposed commercial operation date of October 15, 2027. The interconnecting utility is PG&E.

The project has an Interconnection Agreement (IA) executed on May 21, 2013, and is currently listed as active in the queue. The point of interconnection (POI) is the Vota-South 60 kV line.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Tehama

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Vota-South 60 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about LASSEN LODGE HYDROELECTRIC