BIG SKY SOLAR (CAISO-768) — Project Summary

Queue ID
CAISO-768
Capacity
483.4 MW
Technology
Solar+Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
IA Status
IA Executed

BIG SKY SOLAR

CAISO-768BetaActiveSolarBatteryCAISOLBNL + Live

483.4 MW hybrid in Los Angeles, CA · In queue since March 2011 · Proposed COD January 2023

483.4 MW

Capacity

2

Components

Solar + Battery

15y 2m

In Queue

IA Executed

IA Status

Signed Sep 2014

Interconnection

Queue → IA

3y 6m

IA → COD

8y 4m

Total Duration

3y 6m

Schedule

40 months past proposed COD

Construction75%
Queue EntryMar 31, 2011

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementSep 10, 2014

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2023-01-31

Technology
Solar320 MW · 66%
Battery163.4 MW · 34%
About

BIG SKY SOLAR is a proposed 483.4 MW hybrid solar and battery energy storage project located in Los Angeles County, California. The development project consists of a 320 MW solar photovoltaic array coupled with a 163.4 MW battery energy storage system. The project is interconnected to Southern California Edison (SCE) and is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-768, with an original queue entry date of March 31, 2011. The proposed commercial operation date was January 31, 2023.

The project's interconnection agreement (IA) has been executed as of September 10, 2014. The point of interconnection (POI) is the Antelope Substation 230kV bus. The BIG SKY SOLAR project has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Antelope Substation 230kV bus

Data Source

LBNL + Live

DeveloperRESreNEWS.BIZ · 2025-04-02
TransactionAcquisitionESG News · 2025-04-03
OfftakerTotalEnergiesESG News · 2025-04-03
PPA structurePhysicalrenewableenergymagazine.com · 2025-04-02
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BIGSK230_2_N022
POI Substation
Antelope Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.