CLPT-CLPT G29
150 MW hybrid in Laramie, WY · In queue since May 2024 · Proposed COD December 2027
150 MW
Capacity
1
Components
Solar
2 years
In Queue
Cluster Study
IA Status
COD target: 2027
Total Duration
3y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
CLPT-CLPT G29 is a proposed 150 MW hybrid solar and battery project located in Laramie County, Wyoming. The development project, consisting of 150 MW of solar capacity, is in the Black Hills Cheyenne Light Fuel and Power Transmission interconnection queue as of May 30, 2024. Its proposed commercial operation date is December 31, 2027. The project's interconnection status is currently in the Cluster Study phase.
The project is listed in the interconnection queue under the name of the utility, CLPT, and would connect to the Wallick 115 kV Substation. The project is categorized as a hybrid facility including both solar and battery storage components.
Generated from interconnection queue and public data sources
State
WY
County
Laramie
Grid Region
Mountain West
Market
—
Developer
—
Utility
Black Hills Cheyenne Light Fuel and Power Transmission
Entity
CLPT
Service Type
—
Point of Interconnection
Wallick 115 kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project CLPT-CLPT G29