Project Duke-165 — Project Summary

Queue ID
Duke-165
Capacity
74.5 MW
Technology
Solar
Status
suspended
Location
Polk, FL
Region
Southeast
Developer
Wild Turkey Solar, LLC
IA Status
Suspended

Duke-165

Duke-165BetaSuspendedSolarDukeLBNL

74.5 MW generation in Polk, FL · In queue since December 2016 · Proposed COD December 2018

74.5 MW

Capacity

1

Components

Solar

9y 5m

In Queue

Suspended

IA Status

COD target: 2018

Interconnection

Total Duration

2 years

Suspended38%
Queue EntryDec 21, 2016

Interconnection request submitted to ISO/RTO

Interconnection Study

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2018-12-31

About

Duke-165 is a proposed solar generation project located in Polk County, Florida, with a total capacity of 74.5 MW. The project, developed by Wild Turkey Solar, LLC, is interconnected with Duke Energy Florida via the Catfish Switching Station 230 kV. It entered the Duke interconnection queue on December 21, 2016, with a proposed commercial operation date of December 31, 2018.

The interconnection agreement (IA) status for the project is currently listed as suspended.

Generated from interconnection queue and public data sources

Project Details

State

FL

County

Polk

Grid Region

Southeast

Market

Developer

Wild Turkey Solar, LLC

Utility

Duke Energy Florida

Entity

Duke

Service Type

Point of Interconnection

Catfish Switching Station 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
FRCC
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project Duke-165