Duke-171
74.5 MW generation in Gilchrist, FL · In queue since December 2016 · Proposed COD May 2023
74.5 MW
Capacity
1
Components
Solar
9y 5m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
6y 5m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-05-12
Duke-171 is a proposed solar generation project with a total capacity of 74.5 MW, located in Gilchrist County, Florida. The developer is listed as Masked, and the interconnecting utility is Duke Energy Florida. This project is in the Duke Energy interconnection queue, with an entry date of December 21, 2016.
The proposed commercial operation date for Duke-171 is May 12, 2023. As of the current interconnection status, the project is in the System Impact Study phase. The point of interconnection is the Hayfield Substation at 230 kV.
Generated from interconnection queue and public data sources
State
FL
County
Gilchrist
Grid Region
Southeast
Market
—
Developer
Masked
Utility
Duke Energy Florida
Entity
Duke
Service Type
—
Point of Interconnection
Hayfield Substation 230 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.