Duke-193
70 MW generation in Levy, FL · In queue since August 2017 · Proposed COD September 2023
70 MW
Capacity
1
Components
Solar
8y 9m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
6y 1m
Schedule
32 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-09-29
Duke-193 is a proposed 70 MW solar generation project located in Levy County, Florida. The development project, with Duke Energy Florida as the utility, entered the Duke Energy interconnection queue on August 11, 2017. The proposed commercial operation date is September 29, 2023. The project's interconnection status is currently in the System Impact Study phase.
The project, being developed by a masked developer, consists of 70 MW of solar photovoltaic generation. The point of interconnection is the Bronson-Chiefland 69 kV line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
FL
County
Levy
Grid Region
Southeast
Market
—
Developer
Masked
Utility
Duke Energy Florida
Entity
Duke
Service Type
—
Point of Interconnection
Bronson-Chiefland 69 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-193