Duke-202.1
74.9 MW generation in Levy, FL · In queue since October 2017 · Proposed COD October 2026
74.9 MW
Capacity
1
Components
Solar
8y 7m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
9 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-10-12
Duke-202.1 is a proposed solar generation project with a total capacity of 74.9 MW, located in Levy County, Florida. The developer is Masked, and the interconnecting utility is Duke Energy Florida. The project is interconnected to the Sunrise Switching Station at 69 kV.
The project is in the Duke Energy Florida interconnection queue, with an entry date of October 16, 2017. The proposed commercial operation date is October 12, 2026, and the Interconnection Agreement (IA) has been executed.
Generated from interconnection queue and public data sources
State
FL
County
Levy
Grid Region
Southeast
Market
—
Developer
Masked
Utility
Duke Energy Florida
Entity
Duke
Service Type
—
Point of Interconnection
Sunrise Switching Station 69 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN