Duke-218
74.9 MW generation in Suwannee, FL · In queue since February 2018 · Proposed COD March 2024
74.9 MW
Capacity
1
Components
Solar
8y 3m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
6y 1m
Schedule
26 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-03-15
Duke-218 is a proposed solar generation project with a total capacity of 74.9 MW, located in Suwannee County, Florida. The developer is listed as Masked, and the interconnecting utility is Duke Energy Florida. The project consists of 74.9 MW of solar photovoltaic generation.
The project is in the Duke Energy Florida interconnection queue (Duke) with a queue entry date of February 15, 2018. Its proposed commercial operation date is March 15, 2024. The project's interconnection status is currently in the System Impact Study phase.
Generated from interconnection queue and public data sources
State
FL
County
Suwannee
Grid Region
Southeast
Market
—
Developer
Masked
Utility
Duke Energy Florida
Entity
Duke
Service Type
—
Point of Interconnection
Chariot Switching Station 115 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-218