Duke-341
74.9 MW generation in Brevard, FL · In queue since January 2024 · Proposed COD June 2026
74.9 MW
Capacity
1
Components
Solar
2y 4m
In Queue
Cluster Study
IA Status
COD target: 2026
Total Duration
2y 5m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-06-01
Duke-341 is a proposed solar generation project located in Brevard County, Florida, with a total capacity of 74.9 MW. The project is being developed by Duke Energy Florida, LLC, and is interconnected with Duke Energy Florida.
The project is listed in the queue of an ISO/RTO in the Southeast region, with a queue entry date of January 10, 2024. The proposed commercial operation date is June 1, 2026, and the interconnection agreement status is currently in the Cluster Study phase.
Generated from interconnection queue and public data sources
State
FL
County
Brevard
Grid Region
Southeast
Market
—
Developer
Duke Energy Florida, LLC
Utility
Duke Energy Florida
Entity
Duke
Service Type
—
Point of Interconnection
New 230 kV switching station 230 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- FRCC
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.