Duke-899433
6.26 MW generation in Montgomery, NC · In queue since June 2023
6.26 MW
Capacity
1
Components
Hydro
2y 11m
In Queue
Cluster Study
IA Status
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-899433 is a proposed hydroelectric generation project with a total capacity of 6.26 MW, located in Montgomery County, North Carolina. The developer is Duke Energy Progress, LLC, and the point of interconnection is the Tillery Hydro Plant Substation. This project is listed in the Duke Energy Progress interconnection queue as of June 28, 2023, with an interconnection agreement status of "Cluster Study".
The proposed project is linked to the existing Tillery Hydro Plant. It is located in the Southeast region and consists solely of hydroelectric generation.
Generated from interconnection queue and public data sources
State
NC
County
Montgomery
Grid Region
Southeast
Market
—
Developer
Duke Energy Progress, LLC
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
Tillery Hydro Plant Substation
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.