Duke-920651
70 MW generation in Darlington, SC · In queue since September 2023
70 MW
Capacity
1
Components
Solar
2y 8m
In Queue
Cluster Study
IA Status
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-920651 is a proposed 70 MW solar generation project located in Darlington County, South Carolina. The project is being developed by Duke Energy Progress and consists of 70 MW of solar photovoltaic generation. It is currently in the Duke Energy Progress interconnection queue with an entry date of September 30, 2023. The project's interconnection status is listed as "Cluster Study" and it is proposed to interconnect at the ROBINSON PLANT - FLORENCE 230KV point of interconnection.
The proposed project is listed as "active" in the interconnection queue.
Generated from interconnection queue and public data sources
State
SC
County
Darlington
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
ROBINSON PLANT - FLORENCE 230KV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.