Project Duke-956180 — Project Summary

Queue ID
Duke-956180
Capacity
99 MW
Technology
Battery
Status
active
Location
Rockingham, NC
Region
Southeast
Developer
IA Status
Cluster Study

Duke-956180

Duke-956180BetaActiveBatteryDukeLBNL

99 MW storage in Rockingham, NC · In queue since June 2024

99 MW

Capacity

1

Components

Battery

1y 11m

In Queue

Cluster Study

IA Status

Interconnection

Total Duration

1y 11m

Impact Study25%
Queue EntryJun 20, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

Duke-956180 is a proposed 99 MW battery storage project located in Rockingham County, North Carolina. The project, developed by Duke, is interconnected with Duke Energy Carolinas at the Dan River CTCC Station 100 kV point of interconnection. It entered the interconnection queue on June 20, 2024, and is currently in the Cluster Study phase.

The proposed project consists entirely of battery storage, with a total capacity of 99 MW. It is located in the Southeast region and is listed as an active project in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

NC

County

Rockingham

Grid Region

Southeast

Market

Developer

Utility

Duke Energy Carolinas

Entity

Duke

Service Type

Point of Interconnection

Dan River CTCC Station 100 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.