Duke-956365
1.9 MW generation in Indian River, NC · In queue since June 2024
1.9 MW
Capacity
1
Components
Solar
1y 11m
In Queue
Cluster Study
IA Status
Total Duration
1y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-956365 is a proposed solar generation project with a total capacity of 1.9 MW. The project is located in Indian River County, North Carolina, within the Southeast region. Duke Energy Progress is the utility, and Duke is the entity associated with the project.
The project is currently in the Duke Energy Progress interconnection queue with a queue entry date of June 29, 2024. Its interconnection status is listed as "Cluster Study". The point of interconnection is the CLINTON FERRELL ST. 115KV substation.
Generated from interconnection queue and public data sources
State
NC
County
Indian River
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
CLINTON FERRELL ST. 115KV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-956365