Duke-956469
192 MW generation in Oconee, SC · In queue since June 2024
192 MW
Capacity
1
Components
Hydro
1y 11m
In Queue
Cluster Study
IA Status
Total Duration
1y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-956469 is a proposed 192 MW hydroelectric generation project located in Oconee County, South Carolina. The project is being developed by Duke Energy Carolinas and is listed as active in their interconnection queue. The project entered the queue on June 20, 2024, and its interconnection status is currently in the Cluster Study phase. The point of interconnection is the Bad Creek Hydro Substation 500 kV.
The proposed project consists of 192 MW of hydroelectric capacity. It is located in the Southeast region and is listed in the Duke Energy Carolinas interconnection queue.
Generated from interconnection queue and public data sources
State
SC
County
Oconee
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
Bad Creek Hydro Substation 500 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.