Duke-957247
40 MW generation in Mecklenburg, NC · In queue since June 2024
40 MW
Capacity
1
Components
Nuclear
1y 11m
In Queue
Cluster Study
IA Status
Total Duration
1y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-957247 is a proposed 40 MW nuclear generation project located in Mecklenburg County, North Carolina. The project, developed by Duke Energy Carolinas, entered the interconnection queue on June 26, 2024. Its interconnection point is the McGuire Switching Station at 500 kV. The project's interconnection status is currently in the Cluster Study phase.
The proposed project is listed in the Duke Energy Carolinas interconnection queue.
Generated from interconnection queue and public data sources
State
NC
County
Mecklenburg
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
MCGUIRE SWITCHING STA 500 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-957247