Duke-961894
80 MW generation in Wayne, NC · In queue since September 2024
80 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-961894 is a proposed 80 MW solar generation project located in Wayne County, North Carolina. The project is being developed by Duke and is interconnected with Duke Energy Progress. It entered the interconnection queue on September 28, 2024, and its interconnection status is currently in the Cluster Study phase.
The proposed project is located in the Southeast region. It is listed in the interconnection queue as a solar project with a total capacity of 80 MW.
Generated from interconnection queue and public data sources
State
NC
County
Wayne
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
LEE SUB - WOMMACK 230KV SOUTH
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.