Duke-962805
44 MW generation in Chester, SC · In queue since September 2024
44 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-962805 is a proposed solar generation project with a total capacity of 44 MW. The project is located in Chester County, South Carolina, within the Southeast region. Duke Energy Carolinas is the interconnecting utility, and the developer is listed as Duke. The project entered the interconnection queue on September 25, 2024.
The project's interconnection status is currently in the Cluster Study phase. The point of interconnection is the Chester Bl/Wh 100 kV substation. The project has appeared in recent news coverage regarding Duke Energy's renewable energy expansion plans.
Generated from interconnection queue and public data sources
State
SC
County
Chester
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
Chester Bl/Wh 100 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-962805