Duke-962913
120 MW generation in Mccormick, SC · In queue since September 2024
120 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-962913 is a proposed solar generation project with a total capacity of 120 MW. The project is located in McCormick County, South Carolina, within the Duke Energy Carolinas service area. Duke is listed as the entity associated with the project.
The project is currently in the Duke Energy Carolinas interconnection queue with an entry date of September 26, 2024. Its interconnection status is listed as "Cluster Study". The point of interconnection is the CLARK HILL 115kV substation.
Generated from interconnection queue and public data sources
State
SC
County
Mccormick
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
CLARK HILL 115kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-962913