Duke-962974
74.9 MW generation in Cumberland, NC · In queue since September 2024
74.9 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-962974 is a proposed solar generation project with a total capacity of 74.9 MW, located in Cumberland County, North Carolina. The project is being developed by Duke and is interconnected with Duke Energy Progress. It entered the interconnection queue on September 27, 2024, and is currently in the Cluster Study phase.
The proposed project is listed in the Duke Energy Progress interconnection queue under queue ID Duke-962974. The point of interconnection is the Erwin - Fayetteville East 230 kV substation.
Generated from interconnection queue and public data sources
State
NC
County
Cumberland
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
Erwin - Fayetteville East 230 kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-962974