Duke-963168
74.9 MW generation in Greenwood, SC · In queue since September 2024
74.9 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-963168 is a proposed solar generation project with a total capacity of 74.9 MW, located in Greenwood County, South Carolina. The project is being developed by Duke and is interconnected with Duke Energy Carolinas. It entered the interconnection queue on September 27, 2024, and is currently in the Cluster Study phase.
The proposed project is listed in the Duke Energy Carolinas interconnection queue. The point of interconnection is at FLORIDA 44kV.
Generated from interconnection queue and public data sources
State
SC
County
Greenwood
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
FLORIDA 44kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.