Project Duke-963467 — Project Summary

Queue ID
Duke-963467
Capacity
68 MW
Technology
Solar
Status
active
Location
Chester, SC
Region
Southeast
Developer
IA Status
Cluster Study

Duke-963467

Duke-963467BetaActiveSolarDukeLBNL

68 MW generation in Chester, SC · In queue since September 2024

68 MW

Capacity

1

Components

Solar

1y 8m

In Queue

Cluster Study

IA Status

Interconnection

Total Duration

1y 8m

Impact Study25%
Queue EntrySep 30, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

Duke-963467 is a proposed 68 MW solar generation project located in Chester County, South Carolina. The project is being developed by Duke and has an interconnection queue entry date of September 30, 2024, with Duke Energy Carolinas. Its interconnection status is currently in the Cluster Study phase within the Duke Energy Carolinas queue.

The proposed project, which appeared in recent news coverage, consists of 68 MW of solar photovoltaic generation. The point of interconnection is the PARR WH 100kV substation.

Generated from interconnection queue and public data sources

Project Details

State

SC

County

Chester

Grid Region

Southeast

Market

Developer

Utility

Duke Energy Carolinas

Entity

Duke

Service Type

Point of Interconnection

PARR WH 100kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Duke Carolinas
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project Duke-963467