Duke-963469
28.75 MW generation in Davidson, NC · In queue since September 2024
28.75 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-963469 is a proposed solar generation project with a total capacity of 28.75 MW. The project is located in Davidson County, North Carolina, within the Duke Energy Carolinas service area. Duke is the listed entity for the project, which consists of 28.75 MW of solar photovoltaic generation.
The project is currently in the Duke Energy Carolinas interconnection queue with a queue entry date of September 30, 2024. Its interconnection status is listed as "Cluster Study". The point of interconnection is the LEXINGTON N 100kV substation.
Generated from interconnection queue and public data sources
State
NC
County
Davidson
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
LEXINGTON N 100kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-963469