Duke-963473
44 MW generation in Greenville, SC · In queue since September 2024
44 MW
Capacity
1
Components
Solar
1y 8m
In Queue
Cluster Study
IA Status
Total Duration
1y 8m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Duke-963473 is a proposed 44 MW solar generation project located in Greenville County, South Carolina. The project is being developed by Duke and is interconnected to Duke Energy Carolinas via the RABON BL 100kV point of interconnection.
The project is currently in the Duke Energy Carolinas interconnection queue with an entry date of September 30, 2024. Its interconnection status is listed as "Cluster Study". The proposed project consists of 44 MW of solar capacity.
Generated from interconnection queue and public data sources
State
SC
County
Greenville
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Carolinas
Entity
Duke
Service Type
—
Point of Interconnection
RABON BL 100kV
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-963473