Duke-PP00002
74.9 MW generation in Darlington, SC · In queue since September 2024 · Proposed COD September 2026
74.9 MW
Capacity
1
Components
Solar
1y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
2 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-09-15
Duke-PP00002 is a proposed solar generation project with a total capacity of 74.9 MW, located in Darlington County, South Carolina. The project is being developed by Duke and is interconnected with Duke Energy Progress. It entered the interconnection queue on September 4, 2024, with a proposed commercial operation date of September 15, 2026. The interconnection agreement status is currently "In Progress (unknown study)".
The project's point of interconnection (POI) is the Darlington County Plant - Bennettsville SW STA.
Generated from interconnection queue and public data sources
State
SC
County
Darlington
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
DARLINGTON COUNTY PLANT - BENNETTSVILLE SW STA
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.