Duke-PP00003
74.9 MW generation in Chesterfield, SC · In queue since September 2024 · Proposed COD October 2026
74.9 MW
Capacity
1
Components
Solar
1y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
2y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-10-15
Duke-PP00003 is a proposed solar generation project with a total capacity of 74.9 MW. The project is located in Chesterfield County, South Carolina, within the Duke Energy Progress service area. Duke is the listed developer. The project entered the Duke Energy Progress interconnection queue on September 4, 2024, with a proposed commercial operation date of October 15, 2026.
The interconnection agreement for Duke-PP00003 is currently listed as "In Progress (unknown study)". The point of interconnection is the Robinson Plant - Rockingham. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
SC
County
Chesterfield
Grid Region
Southeast
Market
—
Developer
—
Utility
Duke Energy Progress
Entity
Duke
Service Type
—
Point of Interconnection
Robinson Plant - Rockingham
Data Source
LBNL
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Duke Carolinas
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project Duke-PP00003