HOVEY (Barilla Solar 1B) (ERCOT-12INR0059b) — Project Summary

Queue ID
ERCOT-12INR0059b
Capacity
7.4 MW
Technology
Solar
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
First Solar
IA Status
IA Executed

HOVEY (Barilla Solar 1B)

ERCOT-12INR0059bBetaActiveSolarERCOTLBNL

7.4 MW generation in Pecos, TX · In queue since December 2010 · Proposed COD March 2025

7.4 MW

Capacity

1

Components

Solar

15y 5m

In Queue

IA Executed

IA Status

Signed Dec 2013

Interconnection

Queue → IA

3 years

IA → COD

11y 3m

Total Duration

3 years

Schedule

13 months past proposed COD

Construction75%
Queue EntryDec 1, 2010

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 26, 2013

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2025-03-31

About

The HOVEY (Barilla Solar 1B) project is a proposed 7.4 MW solar generation project located in Pecos County, Texas. The developer is First Solar. It is listed in the ERCOT interconnection queue as entry ERCOT-12INR0059b, with a queue entry date of December 1, 2010. The proposed commercial operation date is March 31, 2025.

The project has an executed Interconnection Agreement (IA), dated December 26, 2013. The point of interconnection (POI) is the 60385 Solstice 138kV substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

First Solar

Utility

Entity

ERCOT

Service Type

Point of Interconnection

60385 Solstice 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
HOVEY_GEN
POI Substation
Solstice Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.