HOVEY (Barilla Solar 1B)
7.4 MW generation in Pecos, TX · In queue since December 2010 · Proposed COD March 2025
7.4 MW
Capacity
1
Components
Solar
15y 5m
In Queue
IA Executed
IA Status
Signed Dec 2013
Queue → IA
3 years
IA → COD
11y 3m
Total Duration
3 years
Schedule
13 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2025-03-31
The HOVEY (Barilla Solar 1B) project is a proposed 7.4 MW solar generation project located in Pecos County, Texas. The developer is First Solar. It is listed in the ERCOT interconnection queue as entry ERCOT-12INR0059b, with a queue entry date of December 1, 2010. The proposed commercial operation date is March 31, 2025.
The project has an executed Interconnection Agreement (IA), dated December 26, 2013. The point of interconnection (POI) is the 60385 Solstice 138kV substation. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
First Solar
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
60385 Solstice 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- HOVEY_GEN
- POI Substation
- Solstice Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about HOVEY (Barilla Solar 1B)