Trent repower
6.4 MW generation in Nolan, TX · In queue since November 2017 · Proposed COD January 2026
6.4 MW
Capacity
1
Components
Wind
8y 6m
In Queue
IA Executed
IA Status
Signed Oct 2018
Queue → IA
11 months
IA → COD
7y 3m
Total Duration
11 months
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2026-01-01
The Trent repower project is a proposed 6.4 MW wind generation project located in Nolan County, Texas. The developer is TRENT WIND FARM LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-17INR0069, with a queue entry date of November 8, 2017. The proposed commercial operation date is January 1, 2026.
The project has an executed Interconnection Agreement (IA) dated October 19, 2018. The point of interconnection (POI) is the 1338 Eskota 138kV substation.
Generated from interconnection queue and public data sources
State
TX
County
Nolan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
TRENT WIND FARM LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
1338 Eskota 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- TRENT_TRENT
- POI Substation
- Eskota Switching Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.