Trent repower (ERCOT-17INR0069) — Project Summary

Queue ID
ERCOT-17INR0069
Capacity
6.4 MW
Technology
Wind
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
TRENT WIND FARM LLC
IA Status
IA Executed

Trent repower

ERCOT-17INR0069BetaActiveWindERCOTLBNL + Live

6.4 MW generation in Nolan, TX · In queue since November 2017 · Proposed COD January 2026

6.4 MW

Capacity

1

Components

Wind

8y 6m

In Queue

IA Executed

IA Status

Signed Oct 2018

Interconnection

Queue → IA

11 months

IA → COD

7y 3m

Total Duration

11 months

Schedule

4 months past proposed COD

Construction75%
Queue EntryNov 8, 2017

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 19, 2018

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-01-01

About

The Trent repower project is a proposed 6.4 MW wind generation project located in Nolan County, Texas. The developer is TRENT WIND FARM LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-17INR0069, with a queue entry date of November 8, 2017. The proposed commercial operation date is January 1, 2026.

The project has an executed Interconnection Agreement (IA) dated October 19, 2018. The point of interconnection (POI) is the 1338 Eskota 138kV substation.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

TRENT WIND FARM LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1338 Eskota 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
TRENT_TRENT
POI Substation
Eskota Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.