Desert Sky repower (ERCOT-17INR0070) — Project Summary

Queue ID
ERCOT-17INR0070
Capacity
7.2 MW
Technology
Wind
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
DESERT SKY WIND FARM LLC
IA Status
IA Executed

Desert Sky repower

ERCOT-17INR0070BetaActiveWindERCOTLBNL + Live

7.2 MW generation in Pecos, TX · In queue since November 2017 · Proposed COD May 2023

7.2 MW

Capacity

1

Components

Wind

8y 6m

In Queue

IA Executed

IA Status

Signed Oct 2018

Interconnection

Queue → IA

11 months

IA → COD

4y 7m

Total Duration

11 months

Schedule

36 months past proposed COD

Construction75%
Queue EntryNov 8, 2017

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 18, 2018

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2023-05-16

About

The Desert Sky repower is a proposed wind generation project located in Pecos County, Texas, with a total capacity of 7.2 MW. The developer is DESERT SKY WIND FARM LLC. The project is interconnected to two LCRA 138kV and is listed in the ERCOT interconnection queue as entry ERCOT-17INR0070, with a queue entry date of November 8, 2017. The proposed commercial operation date was May 16, 2023.

The project has an Interconnection Agreement (IA) executed on October 18, 2018. The project is currently listed as active in the interconnection queue. The Desert Sky repower has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

DESERT SKY WIND FARM LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

two LCRA 138kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Desert Sky repower