Indian Mesa repower
9.3 MW generation in Pecos, TX · In queue since May 2018 · Proposed COD December 2026
9.3 MW
Capacity
1
Components
Wind
8 years
In Queue
IA Executed
IA Status
Signed Dec 2018
Queue → IA
7 months
IA → COD
8 years
Total Duration
7 months
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2026-12-31
The Indian Mesa repower is a proposed 9.3 MW wind generation project located in Pecos County, Texas. Developed by Nextera, the project is interconnected to the ERCOT grid under queue ID ERCOT-18INR0069. The project entered the queue on May 22, 2018, and has a proposed commercial operation date of December 31, 2026.
The interconnection agreement for the project was executed on December 4, 2018. The point of interconnection is the 76019 Indian NWP 138kV substation.
Generated from interconnection queue and public data sources
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Nextera
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
76019 Indian NWP 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.