Bestla Solar (ERCOT-19INR0031) — Project Summary

Queue ID
ERCOT-19INR0031
Capacity
180 MW
Technology
Solar
Status
suspended
Location
Winkler, TX
Region
ERCOT
Developer
IA Status

Bestla Solar

ERCOT-19INR0031BetaSuspendedSolarERCOTLBNL

180 MW generation in Winkler, TX

180 MW

Capacity

1

Components

Solar

In Queue

IA Status

Interconnection
Suspended0%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

The Bestla Solar project is a proposed 180 MW solar generation project located in Winkler County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-19INR0031. Its status is currently suspended.

The project is being developed within the ERCOT region. The queue entry date and proposed commercial operation date are not available. There is no record of an Interconnection Agreement (IA) being executed. The developer is not specified in the available data.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Winkler

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Utility

Entity

ERCOT

Service Type

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Bestla Solar