Myrtle Solar
321.2 MW generation in Brazoria, TX · In queue since March 2017 · Proposed COD June 2026
321.2 MW
Capacity
1
Components
Solar
9y 2m
In Queue
IA Executed
IA Status
Signed Nov 2019
Queue → IA
2y 8m
IA → COD
6y 7m
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-06-30
Myrtle Solar is a proposed solar generation project located in Brazoria County, Texas, with a total capacity of 321.2 MW. The developer is Myrtle Solar, LLC. This project is listed in the ERCOT interconnection queue as entry ERCOT-19INR0041, with a queue entry date of March 15, 2017, and a proposed commercial operation date of June 30, 2026. The Interconnection Agreement (IA) has been executed as of November 13, 2019.
The project is linked to the existing operating plant named Myrtle Solar, LLC (EIA plant ID 66910). Recent news coverage of the project includes 14 articles related to industry, grid, development, and regulatory topics.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Myrtle Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
42110 Angleton 138kV
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MYR_ALL
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14
View all articles