Long Point Solar
120 MW generation in Brazoria, TX · In queue since March 2017 · Proposed COD April 2026
120 MW
Capacity
1
Components
Solar
9y 2m
In Queue
IA Executed
IA Status
Signed Oct 2019
Queue → IA
2y 7m
IA → COD
6y 6m
Total Duration
2y 7m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-04-07
Long Point Solar is a proposed 120 MW solar generation project in Brazoria County, Texas. Developed by Long Point Solar, LLC, the project consists of 120 MW of solar photovoltaic generation. It is listed in the ERCOT interconnection queue as entry ERCOT-19INR0042, with a queue entry date of March 15, 2017, and a proposed commercial operation date of April 7, 2026. The project's Interconnection Agreement (IA) was executed on October 24, 2019.
The proposed project is linked to the existing Long Point Solar operating plant (EIA ID 68998). Recent news coverage indicates activity related to the project, with 13 articles categorized as deals, industry, regulatory, grid, and development.
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Long Point Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
138 KV (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430) ckt 02
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- RN_LNP_SLR
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.