Kontiki 1 Wind (ERIK) (ERCOT-19INR0099a) — Project Summary

Queue ID
ERCOT-19INR0099a
Capacity
250.1 MW
Technology
Wind
Status
suspended
Location
Glasscock, TX
Region
ERCOT
Developer
IA Status

Kontiki 1 Wind (ERIK)

ERCOT-19INR0099aBetaSuspendedWindERCOTLBNL

250.1 MW generation in Glasscock, TX

250.1 MW

Capacity

1

Components

Wind

In Queue

IA Status

Interconnection
Suspended0%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

The Kontiki 1 Wind (ERIK) project is a proposed 250.1 MW wind generation facility located in Glasscock County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-19INR0099a. Its status is currently suspended.

The proposed project, which consists solely of wind generation, is located within the ERCOT region.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Utility

Entity

ERCOT

Service Type

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Kontiki 1 Wind (ERIK)