Roadrunner Crossing Wind SLF
128 MW generation in Eastland, TX · In queue since September 2017 · Proposed COD January 2025
128 MW
Capacity
1
Components
Wind
8y 8m
In Queue
IA Executed
IA Status
Signed Apr 2020
Queue → IA
2y 7m
IA → COD
4y 9m
Total Duration
2y 7m
Schedule
15 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2025-01-31
The Roadrunner Crossing Wind SLF project is a proposed 128 MW wind generation project located in Eastland County, Texas. The developer is Roadrunner Crossing Wind Farm, LLC. This project is listed in the ERCOT interconnection queue as ERCOT-19INR0117, with an original queue entry date of September 8, 2017, and a proposed commercial operation date of January 31, 2025. An Interconnection Agreement (IA) for the project was executed on April 17, 2020.
The project is linked to the existing Roadrunner Wind Farm (EIA plant ID 66902). Recent news coverage has discussed this development project.
Generated from interconnection queue and public data sources
State
TX
County
Eastland
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Roadrunner Crossing Wind Farm, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
68051 Reata 345kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- RRC_WIND_ALL
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.