Longbow Solar
80 MW generation in Brazoria, TX · In queue since August 2017
80 MW
Capacity
1
Components
Solar
8y 9m
In Queue
IA Executed
IA Status
Signed Jan 2021
Queue → IA
3y 5m
Total Duration
3y 5m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Commercial operation date not yet determined
Longbow Solar is a proposed 80 MW solar generation project located in Brazoria County, Texas. Developed by Longbow Solar, LLC, the project is interconnected within the ERCOT region under queue ID ERCOT-20INR0026. The project entered the interconnection queue on August 16, 2017. Its interconnection agreement was executed on January 6, 2021, and the project is currently listed as suspended.
The proposed project is linked to the existing Longbow Solar, LLC operating plant (EIA ID 65521).
Generated from interconnection queue and public data sources
State
TX
County
Brazoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Longbow Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
42110 Angelton - 42870 Liverpool 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_HOUSTON
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LON_RN1