Wang Solar SLF
144.6 MW generation in Falls, TX · In queue since June 2018 · Proposed COD March 2026
144.6 MW
Capacity
1
Components
Solar
7y 11m
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
7y 9m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-03-31
The Wang Solar SLF project is a proposed 144.6 MW solar generation project located in Falls County, Texas. Developed by BT Yixin Solar, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-20INR0106, with a queue entry date of June 14, 2018. The proposed commercial operation date is March 31, 2026, and the project's interconnection status is currently in the Facility Study phase.
The proposed project involves a single solar component with a capacity of 144.6 MW. The point of interconnection is the tap 345kV 3409 LakeCr1 - 3414 TempSS. The Wang Solar SLF project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
TX
County
Falls
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
BT Yixin Solar, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
tap 345kV 3409 LakeCr1 - 3414 TempSS
Data Source
LBNL + Live
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Wang Solar SLF