Walleye Solar (ERCOT-20INR0127) — Project Summary

Queue ID
ERCOT-20INR0127
Capacity
215.2 MW
Technology
Solar
Status
active
Location
Milam, TX
Region
ERCOT
Developer
Sandow Lakes Ranch Solar II, LLC
IA Status
Facility Study

Walleye Solar

ERCOT-20INR0127BetaActiveSolarERCOTLBNL + Live

215.2 MW generation in Milam, TX · In queue since July 2018 · Proposed COD October 2027

215.2 MW

Capacity

1

Components

Solar

7y 10m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

9y 3m

Facilities Study50%
Queue EntryJul 3, 2018

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-01

About

The Walleye Solar project is a proposed 215.2 MW solar generation facility located in Milam County, Texas. The developer is Sandow Lakes Ranch Solar II, LLC. This project is currently active in the ERCOT interconnection queue as entry ERCOT-20INR0127, with a queue entry date of July 3, 2018. The proposed commercial operation date is October 1, 2027. The project's interconnection status is currently in the Facility Study phase, and the point of interconnection is the 138kV Walleye Creek Switch 3712.

The proposed project consists of 215.2 MW of solar photovoltaic generation. It has appeared in recent news coverage regarding renewable energy development in Texas.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Milam

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sandow Lakes Ranch Solar II, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

138kV Walleye Creek Switch 3712

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Walleye Solar