Soda Lake Solar 1 SLF (ERCOT-20INR0143) — Project Summary

Queue ID
ERCOT-20INR0143
Capacity
202.99 MW
Technology
Solar
Status
active
Location
Crane, TX
Region
ERCOT
Developer
IA Status

Soda Lake Solar 1 SLF

ERCOT-20INR0143BetaActiveSolarERCOTLBNL + Live

202.99 MW generation in Crane, TX · Proposed COD December 2027

202.99 MW

Capacity

1

Components

Solar

In Queue

IA Status

COD target: 2027

Interconnection
Pre-Study0%
Queue Entry

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

The Soda Lake Solar 1 SLF project is a proposed 202.99 MW solar generation project located in Crane County, Texas. The project is listed in the ERCOT interconnection queue as entry ERCOT-20INR0143. The proposed commercial operation date is December 1, 2027.

The project is currently listed as active in the ERCOT queue. Recent news coverage indicates activity surrounding the development.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Crane

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Utility

Entity

ERCOT

Service Type

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Soda Lake Solar 1 SLF