CAROL wind (ERCOT-20INR0217) — Project Summary

Queue ID
ERCOT-20INR0217
Capacity
165.42 MW
Technology
Wind
Status
active
Location
Potter, TX
Region
ERCOT
Developer
NextERA Energy
IA Status
IA Executed

CAROL wind

ERCOT-20INR0217BetaActiveWindERCOTLBNL

165.42 MW generation in Potter, TX · In queue since December 2018 · Proposed COD April 2026

165.42 MW

Capacity

1

Components

Wind

7y 5m

In Queue

IA Executed

IA Status

Signed Sep 2020

Interconnection

Queue → IA

1y 9m

IA → COD

5y 7m

Total Duration

1y 9m

Schedule

1 months past proposed COD

Construction75%
Queue EntryDec 6, 2018

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementSep 11, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-04-15

About

The CAROL wind project is a proposed 165.42 MW wind generation project located in Potter County, Texas. The developer is NextERA Energy. It is interconnected within the ERCOT region under queue ID ERCOT-20INR0217, with an interconnection queue entry date of December 6, 2018. The proposed commercial operation date is April 15, 2026. The interconnection agreement (IA) was executed on September 11, 2020.

The proposed project is linked to the existing Carol Wind, LLC operating plant (EIA plant ID 66976). The project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Potter

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextERA Energy

Utility

Entity

ERCOT

Service Type

Point of Interconnection

23906 AJ Swope 345kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW
POI Substation
AJ Swope Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.