Knickerbocker Solar SLF (ERCOT-20INR0235) — Project Summary

Queue ID
ERCOT-20INR0235
Capacity
241.26 MW
Technology
Solar
Status
active
Location
Tom Green, TX
Region
ERCOT
Developer
Knickerbocker Solar LLC
IA Status
Facility Study

Knickerbocker Solar SLF

ERCOT-20INR0235BetaActiveSolarERCOTLBNL

241.26 MW generation in Tom Green, TX · In queue since January 2019 · Proposed COD June 2027

241.26 MW

Capacity

1

Components

Solar

7y 4m

In Queue

Facility Study

IA Status

COD target: 2027

Interconnection

Total Duration

8y 5m

Facilities Study50%
Queue EntryJan 7, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

About

The Knickerbocker Solar SLF project is a proposed 241.26 MW solar generation facility located in Tom Green County, Texas. The project, developed by Knickerbocker Solar LLC, is currently in the ERCOT interconnection queue as entry ERCOT-20INR0235, with a queue entry date of January 7, 2019. The proposed commercial operation date is June 1, 2027.

The project's interconnection status is currently in the Facility Study phase. The point of interconnection (POI) is Tap 345kV 76003 Big Hill - 76009 Twin Buttes. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Tom Green

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Knickerbocker Solar LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Tap 345kV 76003 Big Hill - 76009 Twin Buttes

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Big Hill Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.