Sand Bluff Wind Repower (ERCOT-20INR0296) — Project Summary

Queue ID
ERCOT-20INR0296
Capacity
0.5 MW
Technology
Wind
Status
active
Location
Glasscock, TX
Region
ERCOT
Developer
RWE Renewables Development, LLC
IA Status
IA Executed

Sand Bluff Wind Repower

ERCOT-20INR0296BetaActiveWindERCOTLBNL

0.5 MW generation in Glasscock, TX · In queue since November 2019 · Proposed COD March 2025

0.5 MW

Capacity

1

Components

Wind

6y 6m

In Queue

IA Executed

IA Status

Signed Nov 2006

Interconnection

IA → COD

18y 4m

Total Duration

6y 6m

Schedule

14 months past proposed COD

Construction75%
Queue EntryNov 27, 2019

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementNov 11, 2006

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2025-03-01

About

The Sand Bluff Wind Repower is a proposed 0.5 MW wind generation project located in Glasscock County, Texas. Developed by RWE Renewables Development, LLC, the project consists of 0.5 MW of wind capacity. It is listed in the ERCOT interconnection queue as entry ERCOT-20INR0296, with a queue entry date of November 27, 2019, and a proposed commercial operation date of March 1, 2025.

The project has an executed Interconnection Agreement (IA), with an IA execution date of November 11, 2006. The Point of Interconnection (POI) is the 1333 McDonald 138kV substation. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

TX

County

Glasscock

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

RWE Renewables Development, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

1333 McDonald 138kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
McDonald Substation