Sand Bluff Wind Repower
0.5 MW generation in Glasscock, TX · In queue since November 2019 · Proposed COD March 2025
0.5 MW
Capacity
1
Components
Wind
6y 6m
In Queue
IA Executed
IA Status
Signed Nov 2006
IA → COD
18y 4m
Total Duration
6y 6m
Schedule
14 months past proposed COD
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2025-03-01
The Sand Bluff Wind Repower is a proposed 0.5 MW wind generation project located in Glasscock County, Texas. Developed by RWE Renewables Development, LLC, the project consists of 0.5 MW of wind capacity. It is listed in the ERCOT interconnection queue as entry ERCOT-20INR0296, with a queue entry date of November 27, 2019, and a proposed commercial operation date of March 1, 2025.
The project has an executed Interconnection Agreement (IA), with an IA execution date of November 11, 2006. The Point of Interconnection (POI) is the 1333 McDonald 138kV substation. The project is currently listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
TX
County
Glasscock
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Renewables Development, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
1333 McDonald 138kV
Data Source
LBNL
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- MEDIUM
- POI Substation
- McDonald Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Sand Bluff Wind Repower